
Rear Extension starting at £25000
Loft Conversion starting at £15000
Garden Room starting at £8000
The Future of Construction: Steel Structure Frames
Steel structure construction has revolutionized the building industry in the UK, offering a modern alternative to traditional brick-and-mortar methods. Whether you are looking to extend your property, convert your loft, or add a garden room or summer house, steel frame construction provides a fast, durable, and cost-effective solution.
Property Extension Using Steel Structure Frames
Expanding your home with a steel structure frame ensures faster construction times compared to traditional methods. Steel frames allow for larger, open-plan spaces without the need for bulky load-bearing walls, making them ideal for contemporary home extensions. Due to their lightweight nature, steel structures also put less stress on foundations, reducing the likelihood of future structural issues.
Loft Conversion with Steel Structure Frames
Loft conversions using steel frames are becoming increasingly popular as they provide added strength without excessive weight. Traditional timber beams require more internal support, whereas steel beams span greater distances, allowing for more design flexibility. This method is particularly advantageous in older properties where the existing structure may not be capable of supporting additional weight.
Garden Rooms & Summer Houses with Steel Frame
A steel-framed garden room or summer house is an excellent way to expand your living space with a modern, durable, and weather-resistant structure. Unlike wood or brick, steel frames offer superior resistance to warping, pests, and moisture damage, ensuring longevity and minimal maintenance.
Pros & Cons - Timeline:
Classic vs. Steel Structure Construction

Traditional methods involve extensive groundwork, curing times for concrete and brickwork, and prolonged drying periods for plaster and cement. A typical property extension can take 2-4 months.
Classic Construction
Pre-engineered steel frames significantly reduce build time. Most steel-frame structures can be assembled in a matter of weeks, with an average project timeline of 4–6 weeks.
Steel Structure Construction
Steel is one of the most sustainable building materials available. It is fully recyclable, reduces waste, and requires less energy-intensive processing compared to concrete and brick. Modern steel-frame buildings are also highly energy-efficient, integrating insulation and ventilation systems to minimise heating and cooling costs.
