EvoStructDESIGN · PLANNING · BUILD
THE EVOSTRUCT JOURNAL

A little knowledge.
A clearer next step.

Explore our existing guides to home improvements, quotations and the building process. Always check the details against your own property and current project documents.

35 guides

2026-09-26

How Much Does a House Extension Cost in London in 2026?

A London extension can look simple on paper, then turn into a much bigger number once you add steelwork, drainage, party wall matters, VAT, finishes, and the kitchen you fell in love with.For 2026, a sensible planning range for a London house extension is £2,500 to £4,500 per m² for many single-storey projects, with complex or high-spec builds often landing higher. A small rear extension may start around £60,000 to £90,000, while a larger kitchen-diner extension can easily move into the £100,000

Read guide →
2026-09-21

Why a Loft Conversion in 2026 Could Be the Best Home Upgrade

A spare room has become one of the most valuable things a home can offer. It can mean a quieter place to work, a proper bedroom for a growing family, a guest room, a hobby space, or simply somewhere to store life without filling every cupboard downstairs.That is why 2026 is shaping up to be a strong year for loft conversions. Moving house remains expensive and stressful for many households, while improving the home already owned can feel more practical. A well-planned loft conversion can add usa

Read guide →