top of page
Loft conversion, Extension, Graden room, Garage conversion
Single Garage Conversion Cost

Start from £8000

Single Garage Office / Playroom

Start from £10000

Single Garage with WC or En-Suite

What’s Included in Our Single Garage Conversion Plans
 
Our comprehensive plans make it easy to visualise, design, and gain approval for your conversion, with every detail carefully tailored to your project.
 
Each plan includes:

  • A full measured site survey (if required)

  • Existing and proposed floor plans

  • Scaled layout drawings and elevations

  • Essential construction details

  • Building Regulation notes for full compliance

  • Digital files provided in PDF and CAD formats

Start from £14000

High-Spec Studio or Bedroom Conversion

Start from £5000

Basic Insulated Room

Essential Steps to a Perfect Garage Conversion

Popular Garage Conversion Ideas:

At EvoStruct, we design and build garage conversions in London that blend comfort, practicality, and modern style, adding real value to your home.
 
Home Office Conversion
Turn your unused garage into a bright and inspiring workspace. Add natural light, power points, heating, and a built-in desk, the perfect setup for remote work or running your own business from home.
 
Small Bedroom or Guest Suite
Create an extra bedroom that’s warm, welcoming, and ideal for older children, visiting family, or even as a private studio apartment.
 
Playroom or Family Den
Keep toys, games, and laughter in their own dedicated space. A garage playroom helps you maintain order in the main house while giving kids the freedom to play.

Utility or Laundry Room Conversion
Move your washing machine, dryer, and storage units into a well-designed utility room. Free up kitchen space while adding practicality and value to your home.

Hobby Room or Creative Studio
From crafting and painting to recording music, design a peaceful, inspiring environment where your creativity can thrive.

Home Gym Conversion
Build your personal fitness hub with rubber flooring, mirrors, and full electrical setup for gym equipment. Train at home, on your own time.

Foundation

One key concern is the existing garage foundation. Often, it’s too shallow to support new walls, windows, or doors in place of the old garage door. If the height of the structure is being increased, deeper foundations may be required.
Your builder might need to excavate and pour new foundations, with a structural engineer confirming their suitability.

Structural Modifications

If you plan to change the roofline or add new doors, windows, or internal walls, these changes could affect the building’s structure and must be approved before construction begins.

Insulation & Energy Efficiency

Garages are not designed for warmth or comfort, they’re naturally draughty and uninsulated.
To meet current energy efficiency standards, all walls, floors, and roofs must be insulated, and new windows and doors must comply with thermal performance requirements.

Ventilation

Every new habitable room must have proper ventilation for healthy air circulation.
Windows should provide an opening equal to at least 1/20th of the floor area, with a clear opening of 0.33m² and minimum dimensions of 450mm x 450mm, plus trickle vents within the frame.

Drainage

If your conversion includes a bathroom or toilet, ensure proper access to existing drainage systems. Some garages may have been built over underground drains, so it’s best to review your property plans to confirm their location before starting work.

From Parking Space
to Living Space!

Building Regulations for Garage Conversions
 
All garage conversions must comply with Building Regulations. To meet the requirements, your conversion must be:

  • Structurally sound

  • Protected with a damp-proof course

  • Insulated to meet energy efficiency standards

  • Electrically safe and fully tested

  • Moisture and fire-proof, with proper ventilation and escape routes

​

Your local authority building control team will inspect key elements such as doors, windows, drainage, and overall structural integrity.

Transforming a garage into a comfortable living space requires compliance with Building Regulations.
 

A well-planned and professionally executed garage conversion can add valuable living space and increase your property’s market value. However, a poorly designed conversion can have the opposite effect, reducing value, creating safety risks, and affecting your home’s structure. That’s why it’s essential to plan carefully and choose a skilled, experienced contractor like EvoStruct.

garage conversion in romford
garage conversion into a garden gym

Garage Conversion Specialist

At EvoStruct, we turn underused garages into beautifully designed, fully compliant living areas, crafted with precision, built to last, and tailored to your lifestyle.

bottom of page