top of page
Loft conversion, Extension, Graden room, Garage conversion

Expert Renovation and Refurbishment Works

Our Renovation Services Costs
 

  • Full Property Renovation – Ideal for complete home makeovers or refurbishment of older properties. We handle everything: demolition, rewiring, plumbing, plastering, insulation, flooring, painting, and finishes.
    Typical cost: from £30,000 – £120,000 depending on property size and specification.
     

  • Bathroom Renovation – From sleek modern bathrooms to spa-like retreats, we design and install with precision.
    Prices start from £5,000 – £15,000.
     

  • Kitchen Renovation – Bespoke kitchens designed for beauty and functionality. Includes layout redesign, new cabinets, worktops, lighting, and flooring.
    Average cost: £8,000 – £25,000.
     

  • Bedroom to Bathroom Conversion – Convert underused spaces into luxurious ensuite bathrooms or dressing areas.
    Typical cost: £8,000 – £18,000.
     

  • Chimney Removal – Safe structural removal with all necessary reinforcements and finishing.
    Starting from £2,000 – £4,500.
     

  • Property Insulation (Internal & External) – Improve energy efficiency and reduce bills with professional insulation upgrades.
    Internal insulation from £60/m², external insulation from £120/m².
     

  • Painting & Decorating – Add personality and freshness to your home with high-quality finishes, feature walls, and durable materials.
    From £1,500 depending on scope.
     

  • Floor Installation – Engineered wood, laminate, tile, or luxury vinyl, expertly fitted for durability and style.
    From £45/m².
     

  • Carpentry Works – Custom wardrobes, doors, skirting boards, staircases, and bespoke joinery crafted to perfection.
     

  • Re-Plumbing & Re-Wiring – Full system upgrades to meet the latest safety and efficiency standards.
    Rewiring from £3,000 – £12,000 | Re-plumbing from £2,500 – £9,000.
     

  • Wall & Ceiling Plastering – Smooth, flawless finishes ready for painting or decorative features.
    From £30/m².
     

  • External Works – Complete outdoor transformations, including decking, patios, fencing, and landscaping.
    Prices vary from £3,000 – £20,000 depending on design and materials.

Full Property Renovation

We handle complete home transformations from top to bottom. From stripping out old finishes to rebuilding and redesigning every room, EvoStruct provides all trades under one roof, including plumbing, electrical, carpentry, and finishing. Perfect for homeowners, landlords, and developers seeking a high-quality, turnkey renovation service.

Bathroom Renovation

Create a luxurious, functional bathroom designed for comfort and relaxation. We manage everything, plumbing, tiling, waterproofing, lighting, and furniture installation, using premium materials and modern design concepts to suit your style and budget.

Kitchen Renovation
 

Upgrade the heart of your home with a stunning, practical kitchen. We provide full kitchen refurbishments, including layout redesign, custom cabinetry, tiling, worktops, appliances, and lighting. Whether you dream of a sleek modern look or a warm traditional design, EvoStruct makes it happen.

Bedroom-to-Bathroom Conversion

Need an extra bathroom or ensuite? We specialise in converting unused bedrooms or spaces into fully equipped bathrooms. Our team ensures all plumbing, ventilation, and waterproofing meet the highest standards, while maintaining harmony with the rest of your home.

Chimney Removal
 

Free up internal space or open your living area with our professional chimney breast removal service. We assess the structure, provide steel support (RSJs) where necessary, and ensure compliance with Building Regulations, leaving you with a seamless, modern layout.

Property Insulation (Internal & External)

Improve comfort and energy efficiency with expert internal or external wall insulation. We use high-performance materials to keep your home warm in winter and cool in summer, helping reduce energy bills and carbon footprint while improving overall property value.

Painting & Decorating

Finish your renovation beautifully with our expert decorators. We offer interior and exterior painting, wallpapering, feature walls, and decorative finishes to add style and personality to your home.

Floor Installation

From luxury vinyl tiles and engineered wood to durable laminate or natural stone, we install all types of flooring with precision. Our team ensures subfloor preparation, insulation, and perfect alignment for a flawless, long-lasting result.

Carpentry Works

Our skilled carpenters craft and install bespoke doors, skirting, wardrobes, staircases, and storage solutions. Custom joinery gives your renovation a premium, tailored finish.

Re-Plumbing & Re-Wiring

Upgrade your home’s essential systems safely and efficiently. We offer full plumbing and electrical installations, including pipework replacement, new consumer units, LED lighting, and smart home features, all certified and compliant with UK regulations.

Wall & Ceiling Plastering
 

Smooth, durable surfaces are key to a professional finish. Our plasterers repair or replace walls and ceilings using high-quality plaster, skim coat, or dry-lining systems, ready for painting or tiling.

External Works (Decking, Patio & Landscaping)

Enhance your outdoor space to complement your new interior. We design and build timber or composite decking, patios, driveways, garden walls, fencing, and landscaping, perfect for relaxing or entertaining in style.

Reimagine Your Home
with EvoStruct

Why Choose EvoStruct
 

Full Design & Build Service – We take care of everything under one roof.
✅ Transparent Quotes – No hidden fees, no surprises.
✅ High-Quality Craftsmanship – Skilled professionals with years of experience.
✅ 10-Year Structural Warranty – Every project is built to last.
✅ Serving London & Surrounding Areas – Local, trusted, and recommended by homeowners.



Build the Home You've Always Wanted
 

Whether it’s a full house renovation, kitchen upgrade, or creating a new bathroom where one didn’t exist, EvoStruct delivers results that combine style, function, and long-term value

At EvoStruct, we bring tired homes back to life through expert property renovation and refurbishment services across London and surrounding areas. Whether you’re updating a single room or completely transforming your entire house, our team delivers turnkey solutions with precision, care, and a touch of modern craftsmanship.
 

We manage every stage of your renovation, from design and planning to structural works, finishes, and final touches, ensuring the entire process is smooth, transparent, and stress-free.

kitchen renovation
structural alteration

Property Renovation Specialist

Comprehensive Home Renovation Solutions
Combining Expert Craftsmanship, Innovative Design, and Seamless Project Management to Transform Your Property into a Space of Lasting Beauty and Value

bottom of page