Begin with the existing building
We consider the walls, floor, roof, openings and connection to the house. Levels, moisture protection, insulation and services can all influence the layout and specification.
Create a room that feels part of the home
A successful conversion connects with the existing circulation and finishes. We discuss natural light, storage, heating and the replacement of the garage opening so the new room works inside and outside.
Agree a complete scope
A quotation may include structural alterations, floor work, windows, services, plastering and finishes. We identify the work included, the items you supply and any information still needed before a firm price can be agreed.
Your questions, answered.
Does an attached garage suit every use?
The right use depends on the existing structure, layout and applicable approvals. Tell us what you want the room to achieve so the design can be assessed accordingly.
