top of page
0D27C386-332A-4E5C-B1CE-3CDBD9CE7657.jpeg

All you need to know about Renovation

Property renovation in the UK can be a comprehensive and multifaceted process, involving various types of renovations to improve the aesthetic appeal, functionality, and value of a property. This guide outlines the necessary details, a list of common refurbishment jobs, associated costs, timelines, and essential documentation needed for successful execution.

​

Overview of Property Renovation

Renovation can range from minor cosmetic changes to significant structural alterations. The aim is to modernise, repair, or completely transform a property while ensuring compliance with local building regulations and standards.

​

Common Types of Renovation

  1. Kitchen Renovation

    • Description: Updating kitchen fixtures, cabinets, appliances, flooring, and layout.

    • Jobs Included:

      • Design and layout planning

      • Cabinet installation or refacing

      • Countertop replacement

      • Appliance installation (ovens, dishwashers, etc.)

      • Plumbing and electrical work

      • Flooring installation

    • Cost: £5,000 - £30,000 depending on size and finishes.

    • Time: 1 - 2 weeks.

  2. Bathroom Renovation

    • Description: Renovating bathrooms to enhance functionality and aesthetics.

    • Jobs Included:

      • Full bathroom design

      • Bathtub and shower installation

      • Toilet and sink installation

      • Tiling (floor and wall)

      • Plumbing and electrical upgrades

      • Lighting installation

    • Cost: £3,000 - £15,000 depending on size and materials.

    • Time: 1 - 2 weeks.

  3. Chimney Removal

    • Description: Removing a non-functional chimney to free up space or improve energy efficiency.

    • Jobs Included:

      • Structural assessment

      • Demolition of chimney stack

      • Roof repair and flashing installation

      • Interior repairs (if needed)

    • Cost: £1,500 - £5,000 depending on the structure.

    • Time: 2 - 4 days.

  4. Internal Alterations

    • Description: Changing the layout of a property to improve flow and usability.

    • Jobs Included:

      • Wall removal or addition

      • Installation of new doors or windows

      • Structural reinforcements

      • Electrical and plumbing modifications

    • Cost: £1,000 - £10,000 depending on the extent of changes.

    • Time: 1 - 4 weeks.

  5. External Refurbishment

    • Description: Enhancing the exterior of a property for curb appeal and protection.

    • Jobs Included:

      • Painting and decorating

      • Window replacement or repair

      • Roof repairs or replacement

      • Landscaping and garden work

      • Driveway repair or replacement

    • Cost: £2,000 - £15,000 depending on the scope.

    • Time: 1 - 2 weeks.

  6. Energy Efficiency Improvements

    • Description: Upgrading insulation, windows, and heating systems to reduce energy costs.

    • Jobs Included:

      • Insulation installation (loft, wall, floor)

      • Window replacement with double or triple glazing

      • Heating system upgrades (boilers, radiators)

    • Cost: £1,500 - £10,000 depending on measures.

    • Time: 1 - 3 weeks.

​

Additional Jobs in Renovation

  • Flooring Installation

    • Types: Carpet, laminate, hardwood, tile

    • Cost: £20 - £100 per square meter.

    • Time: 1 - 4 days.

  • Electrical Work

    • Rewiring, adding sockets, lighting upgrades.

    • Cost: £100 - £300 per socket; £1,500 - £5,000 for rewiring a whole house.

    • Time: 1 - 3 days.

  • Plumbing Work

    • Updating pipes, adding radiators, repairing leaks.

    • Cost: £50 - £150 per hour for plumbers.

    • Time: Varies depending on the job.

  • Decorative Work

    • Painting, wallpapering, and finishing touches.

    • Cost: £10 - £40 per square meter.

    • Time: 2 - 7 days.

​

Documentation Required

  1. Planning Permission:

    • Required for significant changes like extensions or structural alterations.

    • Application submitted to the local council.

  2. Building Regulations Approval:

    • Necessary for any structural work or alterations affecting health and safety.

    • Check local authority requirements.

  3. Party Wall Agreement:

    • Required if the work affects a shared wall with a neighbor.

    • Notify neighbors and obtain written consent.

  4. Insurance:

    • Building and contents insurance may need updating.

    • Consider contractors' liability insurance for protection against accidents.

  5. Energy Performance Certificate (EPC):

    • Needed if making significant energy efficiency changes.

​

Cost Summary

Kitchen Renovation: £5,000 - £30,000 - 1 weeks

Bathroom Renovation: £3,000 - £15,000 - 1 week

Chimney Removal: £1,500 - £5,000 - 1 week

Internal Alterations: £1,000 - £10,000 - 2 weeks

External Renovation: £2,000 - £15,000 - 2 weeks

Energy Efficiency Improvements: £1,500 - £10,000 - 2 weeks

​

Conclusion

Property renovation in the UK is a structured process that can significantly enhance a property's value and living conditions. Understanding the various types of renovations, associated costs, timelines, and necessary documentation is crucial for a successful project. Whether undertaking a DIY approach or hiring professionals, careful planning and execution can lead to a rewarding outcome.

Get in Touch

275 New North Road

N1 7AA

  • Whatsapp
  • Facebook
  • Instagram
  • TikTok

Thanks for submitting!

bottom of page