EvoStructDESIGN · PLANNING · BUILD
LONDON RESIDENTIAL DESIGN & BUILD

Structural alterations in London

Create a better connection between rooms with carefully planned structural alterations. EvoStruct undertakes residential steelwork and internal building alterations across London, coordinated with the project's structural design.

Discuss your project
Structural alterations in London — imagery from the EvoStruct website

Work from the structural design

Share the engineer's drawings and calculations if these are already available. The beam arrangement, supports, connections and existing construction are reviewed as part of defining the building scope.

Plan installation and access

Getting structural steel into an occupied home needs a practical plan. We consider the access route, handling arrangements, temporary works and the construction sequence for the particular property.

Include the work around the steel

Making good, fire protection, services that cross the work area and final finishes should be identified alongside the structural installation. We set these out in the quotation so the boundary of the work is clear.

Your questions, answered.

Can you price from an engineer's pack?

Yes. Send the drawings and calculations with site photographs and access details. We identify any further information needed to prepare the quotation.

YOUR HOME / YOUR NEXT CHAPTER

Let’s make room for
what matters to you.

Share your postcode, ideas and any drawings. We’ll discuss the next step towards a clear, written quotation.

Start your project →Get an initial online estimate →